EasyManua.ls Logo

3Com 4210G Series - Installation Flow for an IRF

3Com 4210G Series
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-18
Installation Flow for an IRF
Figure 3-24 Installation flow for an IRF
Table 3-4 Description of the installation flow for an IRF of switches
No Task Remarks
1
Draw a plan for
an IRF with
switches
Take the following into consideration:
z Number of IRF members and the bandwidth
z Interface modules and cables
z Physical connection mode( daisy chain connection or ring connection)
z Cable connection
For details, see
Drawing a Plan for an IRF with Switches.
2
Install the IRF
members to the
correct position
For detailed installation procedures, see:
z Installing the Switch into a 19-Inch Rack Using Mounting Brackets.
z Mounting the Switch on a Workbench.
3
Connect
grounding
cables and
power cords for
the switches
For details, see:
z Connecting the Grounding Cable
z Connecting the Power Cords

Table of Contents

Other manuals for 3Com 4210G Series

Related product manuals