Installation and Set-Up (Continued)
Figure 2-2  Machine Bed Height Adjustment and Lower Tape Drum Bracket Position
3. Use appropriate material handling
equipment to remove the machine from the
pallet and move it into position.
Whenever the machine is lifted with a fork
truck, insure that the forks span completely
across the machine frame and do not
contact any wiring or mechanism under the
machine frame. In some cases the lower
taping head may need to be removed to
avoid damage.
7. Remove the plastic ties that secure the lower
taping head in place.
8. Adjust case sealer bed height. The case sealer
is equipped with four adjustable legs that are
located at the corners of the machine frame. The
legs can be adjusted to obtain different machine
bed heights from 520 mm [20-1/2 inches]
minimum to 785 mm [31 inches] maximum.
Refer to Figure 2-2A and set the machine bed
height as follows:
a. Block up the machine frame to allow
adequate leg adjustment.
b. Loosen, but do not remove, two socket head
screws in one leg (use M6 hex wrench).
Adjust the leg length for the desired machine
bed height. Retighten the two screws to
secure the leg. Adjust all four legs equally.
CAUTION  Machine weighs
approximately 200 kg [430 lbs]
uncrated.
4. Remove tie down straps on either side of the
upper taping head frame assembly.
5. Install upper tape drum bracket on the inner
column assembly crossbar as shown in
Figure 2-1.
6. The column guards have been shipped loose with
the machine. Install the guards on the outer
columns as shown in Figure 2-1 using screws,
washers and bumper stop plates that are shipped
installed on the outer columns.