Table 2 Inspection and Maintenance Log
Inspection Date: Inspected By:
Component: Inspection: (See Section 2 for Inspection Frequency) User Competent
Person
Cable Guides
(Figure 1)
Check cable guides for damage. Look for wear or damage to black
urethane. Cable guides should restrain the cable and prevent cable
contact with the ladder/structure. Cable guides should be positioned at
approximately 20-40 ft. (6-12 m) along the carrier cable, or closer if
required. Replace parts if defects are found.
Check cable guide fasteners. The fasteners should the secure cable guide
in position. Tighten as necessary.
Cable
(Figure 1)
Inspect the cable for corrosion, kinks or damage that will aect strength
and impede the cable sleeve from traveling on the cable. If there are
any nicks or kinks in the ladder cable, the cable must be inspected by a
competent person prior to use. Inspect for signs of abrasion against the
ladder or structure. Replace the cable if defects are found.
Inspect for proper tension. Groove should be exposed above bottom
template (see callout “E”, Figure 11.1). You should not be able to pull
tension rod down by hand. Cable should be tight enough to prevent
contact with the ladder/structure. Re-tension the cable if necessary. Do
not over-tension the system.
Labels
(Figure 9)
Ensure that all labels are present and fully legible.
PFAS and Other
Equipment
Additional Personal Fall Arrest System (PFAS) equipment (harness, SRD,
etc) that are used with the Anchorage System should be installed and
inspected per the manufacturer’s instructions.
Structure Verify the structure to which the structure is attached meets the strength
requirements from Table 1 in all possible directions of loading.
Serial Number(s): Date Purchased:
Model Number(s): Date of First Use:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:
Corrective Action/Maintenance: Approved By: Next inspection due:
Date:

Related product manuals