EasyManua.ls Logo

3M Sarns TCM II - Periodic Operator Checks; Alarm Limit Accuracy

3M Sarns TCM II
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
Maintenance
Periodic
Operator
Checks
The
following
tests
may
be
performed
periodically
between
the
6
month
service
checks
made
by
Sarns
Service.
Temperature
Accuracy
1.
Connect
the
ART
water
In
and
Out
ports
with
tubing
to
make
a
closed
circuit.
2.
Attach
a
Temperature
Probe
and
a
temperature
measuring
device
to
the
closed
circuit.
3.
Set
various
temperatures;
once
each
temperature
is
attained,
compare
the
readings
for
the
Maintain
setting,
the
water
temperature
display,
and
the
measuring
device.
All
temperatures
should
be
within
1°C
of
each
other.
Operating
Modes
1.
Set
a
Maintain
temperature
of
30°C
and
begin
Maintain
mode;
the
water
temperature
display
should
stabilize
at
30°C.
2.
Change
to
Rewarm
mode;
the
water
temperature
should
rise.
3.
Change
to
Cooldown
mode;
the
water
temperature
should
drop.
H20
>
42"C
Warning
1.
Operate
the
unit
in
Rewarm
mode
until
up
to
42°C;
check
with
a
measuring
device
that
the
water
outlet
temperature
remains
below
42°C.
2.
Add
sufficiently
hot
water
to
the
large
tank
to
exceed
43°C;
check
that
the
H20
>
42°C
Warning
LED
lights
and
the
alarm
sounds.
20
Low
Flow
to
Blanket
Warning
If
using
the
Blanket
Supply,
select
Cooldown,
Main-
tain,
or
Rewarm
mode
and
kink
the
tubing
leading
to
the
blanket
In
port;
within
20
seconds,
the
Low
Flow
to
Blanket
LED
should
light.
Unkink
the
tubing
and
the
LED
should
go
out.
Current
Leakage
Maximum
current
leakage
should
not
exceed
100
microamps
when
the
unit
is
in
any
mode.
To
measure
the
current
leakage,
refer
to
Underwriters
Laboratory
or
IEC
Standards
for
the
correct
procedure.
Alarm
Limit
Accuracy
1.
Set
a
low
alarm
for
12°C.
Test
Probes
A,
B,
and
C
by
placing
the
probe
in
ice
cold
water;
the
warning
alarm
should
sound
and
the
probe
LED
flash.
Remove
the
probe
from
the
water
and
the
alarm
should
stop.
2.
Set
a
high
alarm
for
30”C.
Test
Probes
A,
B,
and
C
by
placing
the
probe
in
water
which
is
over
30"C;
the
warning
alarm
should
sound
and
the
probe
LED
flash.
Remove
the
probe
from
the
water
and
the
alarm
should
stop.
Sarns
Service
Checks
It
is
recommended
that
the
entire
system
have
a
maintenance
inspection
every
six
months
to
ensure
proper
operation.
Maintenance
inspections
and
repairs
are
to
be
conducted
only
by
Sarns
Service,
your
local
3M
subsidiary
or
your
authorized
Sarns
distributor.
20