EasyManua.ls Logo

Aastra Ascotel IntelliGate 2025 - Page 44

Aastra Ascotel IntelliGate 2025
1014 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ascotel IntelliGate 2025/2045/2065
44 Target Audience and Structure of the System Manual
"Part 6 Commissioning"
Before commissioning and handing over the system to the customer, a check is
carried out to see whether the system complies with the project specifications,
and whether it is operating correctly. Part 6 lists the general tests and function
tests for the technical commissioning.
The check-list at the end provides valuable assistance when handing over the sys-
tem to the customer.
"Part 7 Operation and Maintenance"
Part 7 deals with the maintenance, expansion and smooth operation of the sys-
tem. It discusses the following topics:
The updating and servicing of configuration data and system software
Hardware updates and system expansion
Licence types and how to adapt them
Replacing, dismantling and reducing hardware and terminals
Monitoring operations and troubleshooting
This part also discusses how the System Event Manager (SEM) has been integrated
to log event messages issued by the system and the Fault and Maintenance
Manager for remote maintenance. Numerous error tables and troubleshooting
measures are provided to help with fault diagnosis and recovery.
"Part 8 Annex"
The Annex lists the generation change, the functions and products no longer sup-
ported, the systematic PCB designation model, compatibility information, techni-
cal data, and the PC Dial commands. You'll also find an overview of the control
elements and digit key assignment for the system terminals, and a summary of
additional documents that can be accessed via the Internet.

Table of Contents

Related product manuals