EasyManua.ls Logo

Aastra Ascotel IntelliGate 2025 - 2 General Checks; 2.1 Checking the Configuration; 2.2 Visual inspection with the system out of operation

Aastra Ascotel IntelliGate 2025
1014 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Ascotel IntelliGate 2025/2045/2065
866 General Checks Part 6
2 General Checks
2.1 Checking the Configuration
When checking the configuration, proceed as follows:
Compare printouts by the AIMS Project Manager (block diagram, layout) with
the project planning data (expansion card configuration, terminals).
Check whether any customer requests for modifications have been taken into
account (for the system configuration, see "Part 5 Configuration").
If changes were made to the DECT system, check the locations of the radio
units. Carry out follow-up measurements where necessary.
If changes were made to the terminals (e.g. other terminal types), check per-
formances, line lengths, S-bus configuration.
2.2 Visual inspection with the system out of operation
Carry out the following visual inspections before connecting the PBX to the power
supply:
Is the installation correct? (wire colours, S bus terminating resistors, loop resis-
tors, see "Checking the installation", page 833).
Is the protective earth and equipotential bonding in place (no earth loops)? (See
"Checking the installation", page 833.)
Are the expansion cards correctly fitted?
Are the jumpers correctly fitted (e.g. on the 2025 / 2045 mainboard, ISDN-
04ST ISDN card, OI-2DOOR special card)?
Is the uninterruptible power supply fitted?
Are the dummy covers fitted?
Is the PBX set up for the required supply voltage?
(e.g. operation with 48 VDC requires the DC-48V module).
Have the correct connecting cables being used for the various applications?
(See "Special Interfaces", page 788.)

Table of Contents

Related product manuals