Ascotel IntelliGate 2025/2045/2065
936 Operations supervision Part 7
6. Turn the rotary switch to position "0" (the "0" position completes a
sequence).
7. Wait for the digit "0" (permanently lit) to appear on the 7-segment display.
The corresponding function is automatically executed; if this is not possible,
an error message will appear.
Note:
An incorrectly entered sequence can be corrected by repeating the input
as of step 1.
See also:
"Hardware-induced initialization", page 853.
4.4.2 Self-test for the DECT system
Self-test for the Ascotel DECT radio unit
Once the AD2 interface has been connected, the radio unit carries out the follow-
ing checks automatically:
• Is a plug-in power supply unit connected?
• Is the power available via the AD2 interface sufficient?
This test is carried out via an internal load circuit if no plug-in power supply is
connected. The test can take up to 10 seconds.
If the test was unsuccessful, the radio unit startup process will be halted; the pilot
LED will flash red until the PBX resets the radio unit.
If the test was successful, the radio unit startup process will proceed and be com-
pleted.
Note:
After the system initialization the radio unit starts in status "AD2 OK".
It is operational only once at least one DECT subscriber is entered in the
numbering plan.