by the IED, see Figure 14. The IP address must be different from the IP address
chosen for the IED.
IEC13000062-1-en.vsd
IEC13000062 V1 EN
Figure 14: Select: Use the following IP address
7. Close all open windows and start PCM600.
Setting up the PC to access the IED via a network
This task depends on the used LAN/WAN network.
The PC and IED must belong to the same subnetwork for this set-up
to work.
4.5 Project managing in PCM600
It is possible to:
Open existing projects
Import projects
Create new projects
Export projects
Delete projects
1MRK 511 284-UEN A Section 4
Setting up a project
650 series 31
Engineering manual

Table of Contents

Other manuals for ABB 650 series