• The station level has been renamed as "DMSTAT"
• The voltage level has been renamed as "C1"
• The bay level has been renamed as "Q1"
• The IED has been renamed as "SB1"
The renamed full path name of the technical key for the IED would be
DMSTATC1Q1SB1.
IEC08000374 V1 EN
Figure 17: PCM600: IEC 61850 signal designation concept
4.7 Inserting an IED
The context menu or the Object Types view shows the available 650 series IEDs
possible to insert, on the bay level in the plant structure, according to the installed
connectivity package.
On the bay level in the plant structure it is possible to:
• Insert an IED in Offline mode or in Online mode:
1MRK 511 284-UEN A Section 4
Setting up a project
650 series 35
Engineering manual