Input power cabling
9. Repeat steps 6…7 for the conductors.
10. Connect the conductors as for the motor cabling. Use terminals L1, L2 and L3.
Tighten the screws to the torque given in the table.
11. Install the cable box plate. Position the plate (11a) and tighten the screw (11b).
11a
11b
11
10a
10b
10
PE,
L1, L2, L3Frame size
lbf·ftN·mMlbf·ftN·m
1.62.2M54.15.6R5
Electrical installation North America 181