EasyManua.ls Logo

ABB ACH580-01 - Installation Preparation and Handling

ABB ACH580-01
398 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
129Connection procedure, frame R5 .................................................................
129IP21 (UL Type 1) ...............................................................................
129IP55 (UL Type 12) .............................................................................
134Connection procedure, frames R6…R9 .......................................................
135Motor cable .......................................................................................
136Input power cable .............................................................................
136Detaching and reinstalling the connectors ........................................
139DC connection ....................................................................................................
140Connecting the control cables ............................................................................
141Default I/O connection diagram (HVAC default configuration) ....................
141R1…R5 .............................................................................................
142R6…R9 .............................................................................................
143Switches ...........................................................................................
144Additional information on I/O connections ...................................................
144PNP configuration for digital inputs ..................................................
144NPN configuration for digital inputs ..................................................
145Connection for obtaining 0…10 V from analog output 2 (AO2) ........
145Connection examples of two-wire and three-wire sensors ...............
146DI5 as frequency input ......................................................................
146DI6 as PTC input ..............................................................................
146
AI1 and AI2 as Pt100, Pt1000, Ni1000, KTY83 and KTY84 sensor
inputs (X1) ........................................................................................
147Safe torque off (X4) ..........................................................................
147Control cable connection procedure R1…R9 ..............................................
153Installing option modules ....................................................................................
154Option slot 2 (I/O extension modules) ..........................................................
155Option slot 1 (fieldbus adapter modules) .....................................................
155Wiring the optional modules .........................................................................
156Reinstalling grommets ........................................................................................
157Reinstalling covers ..............................................................................................
157Reinstalling cover, frames R1…R4 ..............................................................
158Reinstalling covers, frame R5 ......................................................................
158IP21 (UL Type 1) ...............................................................................
158IP55 (UL Type 12) .............................................................................
159Reinstalling side plates and covers, frames R6…R9 ...................................
159IP21 (UL Type 1) ...............................................................................
159IP55 (UL Type 12) .............................................................................
160Connecting a PC .................................................................................................
161Connecting a remote panel, or chaining one panel to several drives .................
7 Electrical installation North America
163Contents of this chapter ......................................................................................
163Warnings .............................................................................................................
164Required tools .....................................................................................................
164Grounding the motor cable shield at the motor end ............................................
Table of contents 9

Table of Contents

Other manuals for ABB ACH580-01

Related product manuals