92 Installation checklist
Cooling and driven equipment
Checks for cooling conditions and motor and driven equipment before start-up are listed
below.
The supply (input power) voltage cannot be applied to the output of the drive through a bypass
connection.
Motor connection box and other covers are in place.
The ambient operating conditions are allowable. (See Losses, cooling data and noise (page 112),
Ambient conditions (page 116.)
The cooling air will flow freely. The protective covering is removed from the top of the drive module.
The motor and the driven equipment are ready for start. (See Planning the electrical installation,
Motor connection data (page 113).