ACS 300 User’s Manual 35
Chapter 5 - Start-up
Flowchart Commissioning Checklist
SAFETY
• Read and follow the safety instructions on page v.
INSTALLATION
• Check for proper grounding.
• Check power wiring.
• Check motor connection.
• Check control wiring.
• Verify availability and quality of cooling air.
PARAMETERS
• Check and complete the parameter values.
TEST RUNS
• Check the operation of the ACS 300 without motor.
• Check the operation of the ACS 300 with motor connected.
• Check external controls and emergency stop.
• Check the rotation direction.