• Spare parts available
• Internal cabling, auxiliary voltage, converter cooling system
• Drive I/O, insulation resistance measurements, MCB
• SW parameterisation, no-load- tuning and running tests
Hot Commissioning
• Spare parts available
• Coupling test: integrated tests with the automation system
• Load tests: tuning controllers, mechanical operation and heat run
Additional work for the drive commissioning engineer (if so
agreed):
• Commissioning of the motor / transformer
• Commissioning of MCB / protection relays
• Adjusting and tuning of external devises (like sensors, switches)
1.8 Commissioning Report
While commissioning the ACS 6000, the commissioning report must
be filled out. After the commissioning this report must be mailed to
mv.ac.supportline@ch.abb.com.
Parameter and back-up file(s) must be:
1 stored with DriveWindow, and if possible also with DriveDebug,
PC-tool,
2 attached to the commisioning report,
3 printed out and filed in the ACS 6000 User’s Manual on site.
In addition to the above mentioned commissioning report also the
internal field service report must always be filled out. In this internal
service report the following summary and data needs to be given:
• Open items
• Deviations to standard commissioning time
• Drive tuning report (pictures), tuning problems
• Special problems, experiences, etc.