Chapter 14 - Finishing the Commissioning
ABB
62 (of 62) 3BHS135824 ZAB E01Rev. D ACS 6000 Commissioning Manual
14.5 Documents and Data for Customer
After the commissioning, the following data need to be given to the
customer:
• Paper copy of the commissioning report.
• Back-up files of the AMC3/CCB signal and parameter table in
DriveWindow and TXT -format.
• Possible changes made in the mechanical and/or electrical
drawings (CHIND is to be informed about changes to converter
part).
14.6 Documents and Back-up Copies
MV AC Supportline (address below):
• Commissioning report, preferably as file.
• Parameter back-up files.
• Travel report.
• Warranty reports of replaced components, if any (to Logistics
Center).
• If you have possibility to take photographs of the installation, send
also the pictures to MV AC Supportline.
Delivery address of the documentation is as follows:
Lotus Notes: MV AC Supportline/CHIND/ABB
Internet: mv.ac.supportline@ch.abb.com
In addition:
If any changes, "red corrections", are made to part lists, spare part lists
or to circuit diagrams, this information is to be delivered to the
responsible project manager of the converter factory (CHIND)!