EasyManua.ls Logo

ABB ACS580-01 - Unpacking and Examining Delivery, Frames R1 and R2

ABB ACS580-01
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation 47
Unpacking and examining delivery, frames R1 and R2
The figure below shows the layout of the transport package. Examine that all items
are present and there are no signs of damage. Read the data on the type designation
label of the drive to make sure that the drive is of the correct type. See section Type
designation label on page 38.
1
6 Plastic bag
7 Straps
8Tray
9 Control panel selected in the order (in a
separate package) in the option box
10 Possible options in separate packages, if
they have been ordered with a plus
code, such as for example +K457
(FCAN-01 CANopen adapter module) in
the option box.
US: Options are installed at the factory.
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
1 Cable box package.
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
2Drive
3 Option tray
4 In the option tray
Multilingual quick installation and
start-up guide
User’s manual (if ordered with a plus
code)
Multilingual residual voltage warning
stickers
5 Cardboard box. Mounting template in the
cardboard box.
4
9
6
10
10
7
5
2
3
8a
8b

Table of Contents

Other manuals for ABB ACS580-01

Related product manuals