50 Mechanical installation
Unpacking and examining delivery, frame R5
The figure below shows the layout of the transport package. Examine that all items
are present and there are no signs of damage. Read the data on the type designation
label of the drive to make sure that the drive is of the correct type. See section Type
designation label on page 38.
5
4
1
2
3
7
8
5 Stopper
6 Cover protecting film
7 Straps
8Pallet
9 Control panel selected in the order (in a
separate package) in the option box
10 Possible options in separate packages, if
they have been ordered with a plus
code, such as for example +K457
(FCAN-01 CANopen adapter module) in
the option box.
US: Options are installed at the factory.
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
1 Cable box package.
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
2Drive
3 In the option box
Multilingual quick installation and
start-up guide
User’s manual (if ordered with a plus
code)
Multilingual residual voltage warning
stickers
4 Cardboard box. Mounting template in the
cardboard box.