EasyManua.ls Logo

ABB ACS580-07 - Page 99

ABB ACS580-07
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
filter (option +E205), connect the phase conductors to the T1/U2, T2/V2 and T3/W2
terminals of the cabinet with cable lugs.
14. Connect the twisted shields of the input cables and separate ground cable (if present)
to the PE terminal of the cabinet and the phase conductors to the L1, L2 and L3 terminals.
13
14
14
13
15.
Tighten the power cable screws to the torque given in Terminal and entry data for the
power cables (page 182).
16. Reinstall the shrouds and mounting plate.
Electrical installation 99
11

Table of Contents

Other manuals for ABB ACS580-07

Related product manuals