EasyManua.ls Logo

ABB ACS580 Series - Page 157

ABB ACS580 Series
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Put the connector back onto the terminal post. Start the combi screw, and
turn it at least two rotations by hand.
WARNING!
Before using tools, make sure that the nut/screw is not cross-threading.
Cross-threading will damage the drive and cause danger.
Tighten the combi screw to a torque of 30 N·m (22 lbf·ft).
Tighten the conductor(s) to 40 N·m (30 lbf·ft) for frame R8 or to 70 N·m
(52 lbf·ft) for frame R9.
11. Frames R8…R9: If you install parallel cables, install the second grounding shelf
for the parallel power cables (11a). Repeat steps 6…11 (11b).
R8…R9R8…R9
11a
11b
M5×25
M5×12
11a
11b
12. Install the grounding shelf of the control cables.
13. Reinstall the shroud on the power terminals.
14. Secure the cables outside the unit mechanically.
13
12
Electrical installation Global (IEC) 157

Table of Contents

Other manuals for ABB ACS580 Series

Related product manuals