EasyManua.ls Logo

ABB ACS580 Series - Cabinet Installation (Option +P944); Examining the Installation Site

ABB ACS580 Series
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cabinet installation (option +P944)
See also ACS580…, ACH580… and ACQ580…+P940 and +P944 drive modules
supplement (3AXD50000210305 [English]).
For generic guidelines for planning the installation of the drive modules into a
user-defined cabinet, see Drive modules cabinet design and construction
instructions (3AUA0000107668 [English]).
Examining the installation site
Examine the installation site. Make sure that:
The installation site is sufficiently ventilated or cooled to remove heat from
the drive. See the technical data.
The ambient conditions of the drive meet the specifications. See the technical
data.
The material behind, above and below the drive is non-flammable.
The installation surface is as close to vertical as possible and strong enough
to support the drive.
There is sufficient free space around the drive for cooling, maintenance, and
operation. See the free space specifications for the drive.
Make sure that there are no sources of strong magnetic fields such as
high-current single-core conductors or contactor coils near the drive. A strong
magnetic field can cause interference or inaccuracy in the operation of the
drive.
For IP66 (UL Type 4X) drives: The drive is protected from sun with an optional
sun shield to prevent excessive heating.
Note: The drive is UV resistant.
60 Mechanical installation
4

Table of Contents

Other manuals for ABB ACS580 Series

Related product manuals