EasyManua.ls Logo

ABB ACS580 Series - Installing the Cable Box, Frames R1

ABB ACS580 Series
468 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R3R2R1IP66
(UL Type 4X)
inmminmminmm
9.612446.891756.89175a
24.4962222.8758119.57497b
lbkglbkglbkgWeight
5826.43214.52611.8
4. Position the drive onto the lower bolts (4a) on the wall to support the weight
of the drive. Rotate drive to the wall and place drive over the upper bolts (4b).
WARNING!
R1…R2, IP21: Do not lift the drive by holding it from the cover. The drive
can fall and become damaged or damage the surroundings.
5. Tighten the bolts in the wall securely.
4a
5
4b
×4
Installing the cable box, frames R1…R2
6. Remove the screw (6a) and lift the cover off (6b) from the separate cable box.
Mechanical installation 87

Table of Contents

Other manuals for ABB ACS580 Series

Related product manuals