100 Option
Insulation test
The insulation test is not recommended, if necessary check the description in Insulation
Resistance Measurements.
Commissioning for MBU=0001 option
Confirm the MCB has been racked out and grounded.
Ground the input busbar in TRU cabinet by grounding harness for safety.
Connect the control cables among the MCB, MBU and COU cabinet.
Disable the local close push button on MCB cabinet.
Connect the auxiliary control power supply to the cabinet.
Check of the isolation switches position
Follow the operation sequence, operate the switches of QS1(Q1), QS2(Q2) and
QS3(Q3).