Quick installation, commissioning and operation flowchart
SeeTask
Type designation key (page 36)
Identify the frame of your drive: R1…R9.
Guidelines for planning the electrical
installation (page 61)
Plan the electrical installation and acquire the accessories
needed (cables, fuses, etc.).
Check the ratings, required cooling air flow, input power
connection, compatibility of the motor, motor connection,
and other technical data.
Technical data (page 177)
Ambient conditions (page 233)
Check the installation site.
Mechanical installation (page 41)
Unpack and examine the drive (only intact units may be
started up).
If the drive has been non-operational
for more than one year, the converter
DC link capacitors need to be re-
formed, Capacitors (page 174)
Make sure that all necessary optional modules and
equipment are present and correct.
Install the drive mechanically.
Routing the cables (page 76)
Route the cables.
ACS880 frames R1 to R11 EMC filter
and ground-to-phase varistor discon-
necting instructions
(3AUA0000125152 [English])
If the drive is about to be connected to an IT (ungrounded),
corner-grounded delta, midpoint-grounded delta or TT
system, check if you need to disconnect the EMC filter
and ground-to-phase varistor.
Electrical installation IEC (page 89)
or Electrical installation North
America (page 117)
Connect the power cables.
Connect the control cables.
Installation checklist (page 151)
Check the installation.
Start-up (page 155)
Start the drive up.
Quick start-up guide, firmware manual
Operate the drive: start, stop, speed control etc.