SeeTask
Guidelines for planning the electrical
installation (page 53)
Plan the electrical installation and acquire the accessories
needed (cables, fuses, etc.).
Check the ratings, required cooling air flow, input power
connection, compatibility of the motor, motor connection,
and other technical data.
Technical data (page 161)
Mechanical installation (page 39)
Unpack and examine the drive.
Grounding system compatibility
check (page 85)
The standard drive can be installed to a symmetrically
grounded TN-S system. If you install the drive to another
system, you may need to disconnect the EMC filter and
ground-to-phase varistor.
Mechanical installation (page 39)
Install the drive on a wall.
Routing the cables (page 69)
Route the cables.
Electrical installation – IEC (page 83)
or Electrical installation – North
America (NEC) (page 113)
Measure the insulation of the input cable and the motor
and the motor cable.
Electrical installation – IEC (page 83)
or Electrical installation – North
America (NEC) (page 113)
Connect the power cables.
Electrical installation – IEC (page 83)
or Electrical installation – North
America (NEC) (page 113)
Connect the control cables.
Installation checklist (page 139)
Check the installation.
22 Introduction to the manual