50 Electrical installation
10. Connect the twisted shields of the power cables to the ground bar of the cabinet
and the phase conductors to the drive module terminals. See
Frame Section Page
R2 Installing the drive module shelves and connecting the cables
– ACS880-01 frames R1 and R2
51
R3 Installing the drive module shelves and connecting the cables
– ACS880-01 frame R3
55
R4, R5 Installing the drive module shelves and connecting the cables
– ACS880-01 frames R1 and R2
51
R6…R9 Installing the drive module shelves and connecting the cables
– ACS880-01 frames R6 to R9
64