70 Installation checklist
The motor cable has been connected to the appropriate terminals, the phase order is
right, and the terminals have been tightened. (Pull the conductors to check.)
The brake resistor (if present) has been connected to the appropriate terminals, and
the terminals have been tightened. (Pull the conductors to check.)
The motor cable (and brake resistor cable, if present) has been routed away from
other cables.
No power factor compensation capacitors have been connected to the motor cable.
The control cables (if any) have been connected to the appropriate terminals, and
the terminals have been tightened. (Pull the conductors to check.)
If a drive bypass connection is used:
The direct-on-line contactor of the motor and
the drive output contactor are either mechanically or electrically interlocked, ie,
cannot be closed simultaneously.
There are no tools, foreign objects or dust from drilling inside the drive module and
the cabinet.
All shrouds and cover of the motor connection box are in place. Cabinet doors have
been closed.
The motor and the driven equipment are ready for start.
Check that …