EasyManua.ls Logo

ABB AMB Series - 5 Electrical installation; 5.1 Insulation resistance test; 5.2 Accessories resistance test

ABB AMB Series
147 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual for Induction Motors and Generators
Commissioning Report - 125
3BFP 000 050 R0101 REV E
5 Electrical installation
5.1 Insulation resistance test
5.2 Accessories resistance test
Network variation:
Space heater operation:
Space heater for slip ring unit:
Stator winding (1 min., 1000 VDC): __________M
, tested by________ kV, winding temperature:______ºC
Stator winding (15 / 60 s. or 1 / 10 min.): PI =__________
, tested by________ kV, winding temperature:______ºC
Rotor winding (1 min.): __________M
, tested by________ kV, winding temperature:______ºC
Exciter stator (1 min., 500 VDC): __________M
, tested by________ kV, winding temperature:______ºC
Space heater: __________M
(500 VDC)
Temperature detectors: __________M
(100 VDC)
N-end bearing insulation: __________M
(100 VDC)
Stator 1 Pt 100:
Stator 2 Pt 100:
Stator 3 Pt 100:
Stator 4 Pt 100:
Stator 5 Pt 100:
Stator 6 Pt 100:
__________
__________
__________
__________
__________
__________
Bearing Pt 100 D-end:
Bearing Pt 100 N-end:
__________
__________
Air temperature 1 Pt 100:
Air temperature 2 Pt 100:
__________
__________
Anti-condensation heater: __________
no yes,
voltage:______-______V, frequency:_____-______Hz
no manual automatic, controlled by:_________________
no yes,
voltage:_____________V, power:_______________W

Table of Contents

Related product manuals