NoteAction
xx2100001483
Route and secure the cabling with a cable strap.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
2
Refitting the process hub
NoteAction
xx2000001539
Check the air hoses.
Replace the cable package if damaged. See Re-
placing the cable package on page 211.
1
Gasket for process hub:
3HAC070887-001
For robots with protection class IP67 (option
3350-670)
2
xx2000002512
Check the gasket.
Replace if damaged.
Seal bolt: 3HAC032050-001For robots with protection class IP67 (option
3350-670)
3
xx2000002513
Check the seal bolts.
Replace if damaged.
Continues on next page
Product manual - CRB 1300 551
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-6 motor
Continued