EasyManua.ls Logo

ABB CRB 15000 - Page 238

ABB CRB 15000
1096 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000002049
Remove the cable plate by removing the attach-
ment screws.
7
xx2000002060
Remove the joint cable from the hollow shaft from
the torque sensor side.
CAUTION
The connectors and the joint unit cables are
sensitive to mechanical damage. Handle the as-
sembly with care.
8
Removing the joint cabling (-10/1.52 and -12/1.27)
Use these procedures to remove the joint-1 cabling.
Preparations before removing the cabling
NoteAction
xx2100000044
Jog the robot to the specified position: xxx
Axis 1:
Axis 2:
Axis 3: +60°
Axis 4:
Axis 5: -90°
Axis 6: No significance.
1
CAUTION
Turn off all supplies for electrical power to the
robot, before starting the repair work.
2
Continues on next page
238 Product manual - CRB 15000
3HAC077389-001 Revision: L
© Copyright 2021 - 2023 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the axis-1 cabling
Continued

Table of Contents

Related product manuals