Maintenance 5
Turbine cleaning during operation 5.3 Page 63
© Copyright 2016 ABB. All rights reserved.
August 2017HZTL2412_ENRevision F
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component Conditions
short
water injection time
long
water injection time
Engine load (guide value) 20 … 40 %
Turbine inlet temperature
T
TE
before water injection
350 - 400 °C 350 - 430 °C
Water supply ensured
Water pressure (overpres-
sure over atmosphere) p
WT
2.0 bar 1.5 bar
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.

Table of Contents

Other manuals for ABB HT564515

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HT564515 and is the answer not in the manual?

ABB HT564515 Specifications

General IconGeneral
BrandABB
ModelHT564515
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals