EasyManua.ls Logo

ABB IRB 120 - Page 132

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
Disconnect connector cables from the
power source, motor cables and SMB.
R1.A1
R1.A2
R1.A3
R1.A4
9
Disconnect the battery cables.10
D in figure above. Do not remove the bat-
tery pack from the bracket.
Remove attachment screws securing
bracket with the battery pack.
11
Remove attachment screws securing the
plate.
12
Disconnect connectors from EIB board:
R1.ME4-6 (J4)
R1.ME1-3 (J3)
R2.EIB
13
Remove the EIB board.
ELECTROSTATIC DISCHARGE
(ESD)
Put the board in an ESD protective bag.
14
Cut cable tie.15
Disconnect connectors:
R2.MP1
R2.ME1.
16
Disconnect earth connection.17
xx0900000884
Unscrew the attachment screws securing
the cable harness to the cable holder.
18
Parts:
A: Swing plate
B: Cable holder
C: Attachment screws (2 pcs)
D: Cable ties (4 pcs)
Continues on next page
132 Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.3.1 Removing the cable harness
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals