EasyManua.ls Logo

ABB IRB 120 - Page 205

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
A
B
xx0900000879
Unscrew the attachment screws securing
the cable bracket.
7
Parts:
A: Cable bracket
B: Attachment screws (2 pcs)
Move the cable harness a little to the side.8
Unscrew the attachment screws securing
the motor axis 3.
9
xx0900000876
Remove the timing belt from the pulleys on
the motor axis.
10
Parts:
A: Timing belt
B: Pulleys (2 pcs)
Remove the motor.11
Refitting axis-3 motor
Use this procedure to refit axis-3 motor.
InformationAction
Clean Room robots: clean the joints that
have been opened. See Replacing parts on
the robot on page 118
1
Continues on next page
Product manual - IRB 120 205
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.7.3 Replacing axis-3 motor with gearbox
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals