EasyManua.ls Logo

ABB IRB 120 - Page 206

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
Make sure that:
all assembly surfaces are clean and
without damages
motor and gearbox are clean and
undamaged.
2
Place the axis-3 motor in the motor cover.3
xx0900000876
Refit the timing belt on the pulleys.4
Parts:
A: Timing belt
B: Pulleys (2 pcs)
Tighten the attachment screws and washers
securing the motor, just enough to still be
able to move the motor.
5
New belt: F = 18-19.7NMove the motor to a position where a good
timing belt tension is reached.
Tip
Use a handheld spring balance to measure
the timing belt tension.
xx1400002560
6
Used belt: F = 12.5-14.3N
Note
Do not strech the timing belt too much!
Tightening torque: 4 Nm.Secure the axis-3 motor with its attachment
screws and washers.
7
Continues on next page
206 Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.7.3 Replacing axis-3 motor with gearbox
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals