EasyManua.ls Logo

ABB IRB 14000 - Page 297

ABB IRB 14000
458 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing the axis-3 cable collar
NoteAction
Turn on the power to the robot temporarily.1
xx1500000489
Release the brakes and rotate axis 3 in order to
access the axis-3 cable collar screws.
2
DANGER
Turn off the electric power supply again.
3
xx1500000756
Remove the screws and remove the cable collar.4
Removing the axis-3 mechanical stop
NoteAction
DANGER
Make sure that all supplies for electrical
power and air pressure are turned off.
1
Turn on the power to the robot temporarily.2
Continues on next page
Product manual - IRB 14000 297
3HAC052983-001 Revision: D
© Copyright 2015 - 2016 ABB. All rights reserved.
4 Repair
4.6.4 Replacing the axis-3 mechanical stop
Continued

Table of Contents

Other manuals for ABB IRB 14000

Related product manuals