EasyManua.ls Logo

ABB IRB 4600 - 60/2.05 - Page 305

ABB IRB 4600 - 60/2.05
374 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
2
How to drain the gearbox is described in sec-
tion:
Changing the oil, axis-2 gearbox on
page 162
Drain the gearbox.3
A
B
C
xx1100000946
A Cable bracket
B Cable bracket
C Cable strap
Loosen the cabling from the lower arm
by removing two cable brackets and a
cable strap.
4
Attach a roundsling around the upper
arm house.
5
Unload the weight of the lower and
upper arm package by stretching the
roundslings with the overhead crane.
Turn on the power temporarily and re-
lease the brakes of axis 2 to rest the
weight onto the roundslings.
6
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
7
Continues on next page
3HAC033453-001 Revision: H 305
© Copyright 2009-2013 ABB. All rights reserved.
4 Repair
4.8.2 Replacing gearbox axis 2
Continued

Table of Contents

Related product manuals