EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 227

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
A
B
C
xx1200000857
A R1.CP/CS
B R1.MP
C Air hose
Before refitting the connectors on the
bracket, arrange cables and connectors as
shown in the figure.
9
xx0900000017
Refit the connectors and air hose on the
bracket:
R1.CP/CS
R1.ETHERNET (if used)
R1.MP
Tip
Do not refit the R1.SMB-connector and air
hose at this stage. It will be easier to refit
these two when the bracket has been fitted
to the distance screws.
10
Connectors:
A: Earth cables
B: R1.SMB1-2
C: R1.SMB3-6
D: R2.SMB
E: R1.CP/CS
F: R1.MP
G: Air hose
H: Position of R1.ETHERNET (if
used)
J: R1.SMB
Continues on next page
Product manual - IRB 4600 Foundry Prime 227
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.2 Refitting the complete cable harness
Continued

Table of Contents

Related product manuals