EasyManua.ls Logo

ABB IRB 4600 Foundry Prime - Page 263

ABB IRB 4600 Foundry Prime
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the base
Use this procedure to refit the complete arm system to the base.
NoteAction
CAUTION
The weight of the base is 49 kg
All lifting accessories used must be sized
accordingly.
1
Lifting eye: M8Fit three lifting eyes to the base and secure
with roundslings in an overhead crane or
similar.
2
xx1800000885
Fit the new base to the support legs and
secure with the attachment screws.
3
Clean the joints that have been opened. See
Cut the paint or surface on the robot before
replacing parts on page 201
4
Tip
Use Loctite 7063 (or similar) for cleaning.
Remove residues of old Loctite and other
contaminations from surfaces before apply-
ing new Loctite 574.
5
Continues on next page
Product manual - IRB 4600 Foundry Prime 263
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.3.6 Replacing the base
Continued

Table of Contents

Related product manuals