NoteAction
Connectors:
Motor axis 1: R2.MP1
Motor axis 2: R2.MP2
Motor axis 3: R2.MP3
Motor axis 4: R2.MP4
Motor axis 5: R2.MP5
Motor axis 6: R2.MP6
Connect to pins:
+ : pin 2
-: pin 5
CAUTION
The connections for the motor brakes
(24 VDC connection) are phase de-
pendent. If the connection on the pins
is switched, it can cause severe dam-
age to vital parts.
In order to release the brakes, connect the 24
VDC power supply.
7
Refitting motors
Use this procedure to refit motors axes 1, 2, 3, 4, 5 and 6.
Note
The procedure contains information how to refit motors on all axes of the robot.
Some steps are only applicable to a certain motor. Follow the steps carefully in
order not to miss vital information!
InformationAction
See Refitting motors on page 314.
Preparations before the refitting
of motors on page 319
Note
Before starting the refitting of the motor, first
make the necessary preparations!
1
Note
Whenever parting/mating motor and gearbox,
the gears may be damaged if excessive force
is used!
2
Clean the joints that have been opened. See
Cut the paint or surface on the robot before
replacing parts on page 201
3
Continues on next page
320 Product manual - IRB 4600 Foundry Prime
3HAC040585-001 Revision: M
© Copyright 2013-2018 ABB. All rights reserved.
4 Repair
4.7.2 Refitting motors
Continued