EasyManua.ls Logo

ABB IRB 6620 - 150/2.2 - 4.4 Upper and lower arm

ABB IRB 6620 - 150/2.2
303 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Repair
4.3.3. Replacement of complete arm system
1733HAC027151-001 Revision: B
© Copyright 2006-2008 ABB. All rights reserved.
7. Look through the empty mounting hole of
motor 1 to assist in aligning the assembly
during refitting of the arm system.
Lower the arm system with guidance from
the guide pins previously fitted to the
gearbox axis 1. Fit the guide pins in the cor-
responding holes in the frame as shown in
the figure to the right.
NOTE!
The refitting must be made completely level!
Make sure the lifting device is adjusted prior
to refitting of arm system.
This is a complex task to be performed
with utmost care in order to avoid injury or
damage!
Use a crank to turn the gearbox in order to
find the right position for the holes.
xx0600003094
A : Holes in frame for guide pins,
shown from below.
xx0600003093
A : Holes in frame for guide pins,
shown from above.
8. Remove the guide pins and secure the arm
system to the base with its 16attachment
screws and washers.
Shown in the figure Location of arm
system on page 166.
M12 x 80, 12.9 quality gleitmo. Tightening
torque: 105 Nm.
Reused screws may be used, providing
they are lubricated as detailed in section
Screw joints on page 261 before fitting.
9. Refit the motor axis 1.
Action Note
Continued
Continues on next page

Table of Contents

Related product manuals