EasyManua.ls Logo

ABB IRB 6620 - 3 Maintenance; 3.1 Introduction

ABB IRB 6620
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 DressPack and SpotPack
2.9.1 Options
3HAC 025861-001 Rev.E 113
Souriau
CP/CS/CBus, Proc 1 axis 6 on tool side for option 780-3.
This kit offers a kit with connectors to be mounted at toolside of axis 6
.
This must be assembled by the customer.
The kit contains:
1 Hose fitting (Parker Push lock (1/2”, M22x1,5 Brass, 24 degree seal))
Connector with:
Figure 74 Connector for CP/CS/CBUS, Proc1 axis 6.
1 pcs UTOW Pin connector 32p (Souriau) Shell size 18
1 pcs Backshell (Souriau) Shell size 14
1 pcs Cable cland, EMC (Souriau) M20 D=11,0-14,0
1 pcs UTOW Pin connector 19p (Souriau) Shell size 14
1 pcs Backshell (Souriau) Shell size 18
1 pcs Cable gland, EMC M25 D=13,0-16,0
40 pcs Pin 0.21-0.93 mm
2
Assembly Accessories to complete connector
Assembly instruction

Table of Contents

Other manuals for ABB IRB 6620

Related product manuals