EasyManua.ls Logo

ABB IRB 6620 - Page 187

ABB IRB 6620
360 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Removal
The procedure below details how to remove the cable harness, axes 1-2.
NoteAction
Decide which calibration routine
to use, and take actions accord-
ingly prior to beginning the re-
pair procedure.
1
In order to facilitate refitting of
the cable harness, run the robot
to the specified positions:
Axis 1:
Axis 2:
Axis 3:
Axis 4:
Axis 5: +90°
Axis 6: no significance
2
DANGER
Turn off all:
electric power supply to
the robot
hydraulic pressure sup-
ply to the robot
air pressure supply to
the robot
Before entering the robot work-
ing area.
3
Shown in the figure Location of cable harness, axes
1-2 on page 185.
Remove the top cover, connec-
tion box from the robot by re-
moving its attachment screws.
4
Continues on next page
Product manual - IRB 6620 187
3HAC027151-001 Revision: T
© Copyright 2006-2018 ABB. All rights reserved.
4 Repair
4.3.1 Replacement of cable harness, lower end (axes 1-2)
Continued

Table of Contents

Other manuals for ABB IRB 6620

Related product manuals