EasyManua.ls Logo

ABB IRB 6640 - 130/3.2 - Page 231

ABB IRB 6640 - 130/3.2
443 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Repair
4.3.5. Replacement of cable harness, axes 5-6 - IRB 6640ID
2293HAC026876-001 Revision: C
© Copyright 2006-2008 ABB. All rights reserved.
Removal, cable harness axes 5-6
The procedure below details how to remove the cable harness from the upper arm.
Standard toolkit The content is defined in
section Standard toolkit on
page 394.
Product manual -
SpotPack/DressPack
Art. no. is specified in
section References.
Equipment Spare part no. Art. no. Note
Action Note
1. Run the robot to its calibration position.
2.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off
the air pressure to motors and SMB.
3. Remove the process cabling from the
upper arm, if any.
How to remove the DressPack harness
from the upper arm and wrist unit is
detailed in the Product manual -
SpotPack/DressPack.
4. Remove the cover from the upper arm tube
and the hood from the upper arm housing.
Shown in the figure Location of cable
harness, axes 5-6 on page 228.
5. Disconnect all the connectors at the axis 5
and 6 motors, and the connector at the
cable harness division point.
The connectors are specified and shown
in the figure Location of cable harness,
axes 5-6 on page 228.
6. Remove the two cable clamps (A) from the
bracket at the back of the upper arm
housing.
xx0500001903
Continued
Continues on next page

Table of Contents

Related product manuals