4 Repair
4.3.6. Replacement of complete arm system
2633HAC023082-001 Revision: E
© Copyright 2004-2008 ABB. All rights reserved.
2.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off
the air pressure to motors and SMB.
3. Drain the oil from gearbox axis 1. Detailed in section Oil change, gearbox
axis 1 on page 182.
4. Loosen the cable connectors from the base
and pull up the cabling from the base,
through the hole in the center of the frame.
5. Remove the motor, axis 1. Detailed in section Removal, motor axis 1
on page 338.
6. Run the overhead crane to a position above
the robot.
7. Fit the lifting device and adjust it as detailed
in the enclosed instructions.
Art. no. is specified in Required equipment
on page 262!
Make sure the lift is done completely level!
How to adjust the lift is described in the
enclosed instruction to the lifting device!
Follow the instructions before lifting!
8. Remove the block for calibration from the
bottom of the frame.
Shown in the figure Location of arm system
on page 261!
9. Unfasten the arm system from the base by
unscrewing its 24attachment screws.
Shown in the figure Location of arm system
on page 261!
10. Fit the two guide pins in two opposite screw
holes.
11 .
CAUTION!
The complete arm system weighs 1250 kg!
All lifting equipment used must be sized
accordingly!
12. Lift the arm system carefully and secure it
in a safe area.
Always move the robot at very low speeds,
making sure it does not tip.
Continue lifting even if the arm system turns
out to be unbalanced despite earlier adjust-
ments! The risk of damaging the interfaces
is bigger if the load is lowered unbalanced!
Make sure all hooks and attachments stay
in the correct position while lifting the arm
system and that the lifting device does not
wear against sharp edges.
Action Note/Illustration
Continued
Continues on next page