5
058 21.0 Replacement of parts in
NAL/VR 36 kV
058 21.1 Replacement of contact
knives
059 21.2 Replacement of draw bar.
Fig. 116
059 21.3 Replacement of the
supporting insulator. Fig. 118
060 21.4 Replacement of the
hollow insulator. Fig. 119
060 21.5 Replacement of the
piston with piston rod.
Fig. 120
061 22.0 Adjustment of splined
shaft end for earthing switch.
Fig. 122- 126
062 23.0 Liabilities
063 24.0 Reference list of fuses
068 25.0 Environmental
declaration
068 25.1 Environmental
Certification Life expectancy
of product
068 25.2 End-of-life
045 17.2 Motor drive settings for
A-mechanism
047 17.3 Motor drive settings for
K-mechanism
048 17.4 UEMC 41
049 18.0 Service and maintenance
049 18.1 Cleaning
049 18.2 Switch-disconnector in
service
050 18.3 Mechanical overhaul
050 18.4 Electrical overhaul in
service
050 18.5 Control of NAL/VR knives
after mounting. Fig. 105-106
054 19.0 Replacement of parts
(12-24 kV)
055 19.1 Replacement of contact
knife with draw bar. Fig.110
055 19.2 Pivot side support
insulator. Fig. 110
056 19.3 Replacement of fixed
contact on the opening side
Fig. 111
056 19.4 Replacement of the
arcing chamber. Fig. 111
057 20.0 Replacement of
insulators
057 20.1 Hollow insulators with
arcing chamber. Fig. 113
057 20.2 Insulator for fuse-base
and quick make earthing
switch