EasyManua.ls Logo

ABB OmniCore V250XT - Page 132

ABB OmniCore V250XT
456 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note/IllustrationAction
Remove the screws and lift out the robot
signal exchange proxy.
3
Installing the DeviceNet board
Note/IllustrationAction
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
When handling the computer outside of
the controller, use the wrist strap button
located on the side of the computer.
1
xx2000000419
xx1800003415
Remove the screws on top of the main
computer and take the cover off.
2
xx1800003414
Remove the attachment screw on the
cover of the fieldbus master and take out
the cover.
3
Continues on next page
132 Product manual - OmniCore V250XT
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.7.5 Installing the fieldbus master
Continued

Table of Contents

Related product manuals