EasyManua.ls Logo

ABB OmniCore V250XT - Page 134

ABB OmniCore V250XT
456 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the robot signal exchange proxy
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 28.
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
The unit is sensitive to ESD. Before
handling the unit read the safety inform-
ation in section The unit is sensitive to
ESD on page 43.
2
xx2000000419
Screws: Torx pan head screw M4x8 (4 pcs)Fit the robot signal exchange proxy and
secure the screws.
3
Insert the cable ties into the locking
holes.
4
Refitting the main computer assembly to the cabinet
Note/IllustrationAction
DANGER
Before doing any work inside the cabinet,
disconnect the mains power. For more
information, see Electrical safety on
page 28.
1
Location of wrist strap button:
ELECTROSTATIC DISCHARGE
(ESD)
When handling the computer outside of
the controller, use the wrist strap button
located on the side of the computer.
2
xx2100000318
Continues on next page
134 Product manual - OmniCore V250XT
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.7.5 Installing the fieldbus master
Continued

Table of Contents

Related product manuals