Electrical installation 53
Insulation test
Before the grid connection, the inverter measures the impedance between the DC
terminals and ground. If the impedance is less than the preset value, the inverter
shows a fault message and it does not connect to the grid.
Inverter
The inverter is tested for insulation between the main circuit and the chassis
(1,500 V
DC
) at the factory. Do not perform any voltage tolerance or insulation
resistance tests on any part of the inverter.
AC output cable
Before you connect the AC output cable, make sure that it obeys the local
regulations.
PV generator
Make sure that the insulation of the PV generator obeys the local regulations and the
manufacturer instructions. Fully disconnect the PV generator from the inverter during
the insulation test.