EasyManua.ls Logo

ABB PRO-33.0-TL Series - Start-up; Before start up

ABB PRO-33.0-TL Series
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start-up 75
8
Start-up
Chapter contents
Before start up (p. 75)
First start up (p. 76)
List of country codes (p. 79)
Remote monitoring setup (p. 80)
String configuration assistant (-SX model) (p. 83)
Programmable relay configuration using FIO-01 module (p. 85)
WARNING! Only qualified electricians are permitted to do the start-up.
Obey the safety instructions in chapter Safety on page 11.
Before start up
Preliminary procedures
Make sure that the mechanical and electrical installation of the inverter is correct. Refer to
chapter Installation checklist on page 71.
Make sure that the mechanical and electrical installation of the rest of the photovoltaic
(PV) system is finished and inspected.
Make sure that the grid owner (or other local authority) is informed about the planned grid
connection of the photovoltaic (PV) system and that the plan is approved.
Make sure that the PV array gets sufficient sunlight during the start-up procedure.
Although the inverter can be started without daylight, adequate sunlight is needed to
make sure that the PV array and grid feed work correctly.