EasyManua.ls Logo

ABB PRO-33.0-TL Series - Page 78

ABB PRO-33.0-TL Series
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
78 Start-up
Make sure that the date, time and installation
country settings are correct.
If you need to correct the settings, push Back with
the left softkey.
Push the right softkey to confirm the installation
country.
Only authorized ABB service partners can change
the installation country.
The Energy: Today view is shown.
On the -S and -SX models, set the inverter DC switch to ON.
Set the external DC switches or circuit breakers to ON.
When adequate DC voltage is available, the
inverter starts to transfer power from the PV
arrays. The inverter then does the system safety
checks. If the safety checks complete without
errors, the inverter connects to the AC grid.
First start-up procedures

Table of Contents

Related product manuals