7 - Operation
During the grid voltage check and measurement of the insulation re-
sistance, the values for the grid voltage and frequency and the insula-
tion resistance measured by the inverter are shown on the display. The
inverter completes parallel connection with the grid SOLELY if the grid
parameters meet the ranges provided for by the regulations in force and
if the insulation resistance is greater than 1Mohm.
If the preliminary checks for parallel connection to the grid are suc-
cessful, the inverter connects to the grid and begins to export power to
the grid. At this stage, the display shows the inverter’s parameters in
cycles. The green LED stays lit whereas the others are off.
The “Country” value (grid standard) that can be selected are listed in the
following table:
Displayed name Display language Displayed name Display language
SINGAPORE English TAIWAN English
THAIL. PEA English KOREA English
VDE0126 3W English CHINA English
THAIL. MEA English HUNGARY English
FRANCE 14 French CORSICA French
EN50438 English PORTUGAL English
CEI 016 Italian GREECE English
TURKEY HV English NETHERL. Dutch
SLOVENIA English FRANCE 13 French
ROMANIA English BDEW German
TURKEY LV English ISRAEL English
BRAZIL English AS 4777 English
C1011 110 French IRELAND English
C1011 100 French UK G59 English
RD 1565 Spanish UK G83 English
S. AFRICA English RD 1699 Spanish
CEI 021 EX. Italian ENEL English
VDE 4105 German VDE 0126 English
CZECH Cestina
The list of grid standards given in the table was valid at the time of issue of the manual. It will
be continually updated as new country standards with which the inverter is compatible are
introduced